Scope of work
Project involved the connection of Pound Road West and Remington Drive with a road over rail grade separation of the Cranbourne rail line, including:
- FRP works of pile caps, abutments, blade and RC column piers, crossheads, bridge decks, approach slabs and friction slabs of the new 4-span bridge
- Installation of precast parapet, median and kerb barriers
- FRP of structural footpaths on both sides of bridge
- FRP of drainage pit on South Gippsland Highway