Pound Rd West Upgrade

PROJECT DETAILS

Our Client: Seymour Whyte

End Client: MRPV

Completed: 2023

Equipment: CIGCURE CIGFORM Reverse form Hydraulic pile splitting Sheet piling

Scope of work

Project involved the connection of Pound Road West and Remington Drive with a road over rail grade separation of the Cranbourne rail line, including:

  • FRP works of pile caps, abutments, blade and RC column piers, crossheads, bridge decks, approach slabs and friction slabs of the new 4-span bridge
  • Installation of precast parapet, median and kerb barriers
  • FRP of structural footpaths on both sides of bridge
  • FRP of drainage pit on South Gippsland Highway